Konzept Einer Bim Basierten Smarten Bauablaufplanung Unter Beruecksichtigung Von Lean Prozessstrategien Schriftenreihe Zu Arbeitswissenschaft Und Technologiemanagement Book PDF, EPUB Download & Read Online Free

Konzept einer BIM-basierten smarten Bauablaufplanung unter Berücksichtigung von Lean-Prozessstrategien
Author: Daniel Sebastian Krause
Publisher:
ISBN: 3839611873
Pages:
Year: 2017
View: 994
Read: 351

Lean Construction Management
Author: Shang Gao, Sui Pheng Low
Publisher: Springer
ISBN: 9812870148
Pages: 390
Year: 2014-05-23
View: 229
Read: 914
The book presents a mixed research method adopted to assess and present the Toyota Way practices within construction firms in general and for firms in China specifically. The results of an extensive structured questionnaire survey based on the Toyota Way-styled attributes identified were developed and data collected from building professionals working in construction firms is presented. The quantitative data presented in the book explains the status quo of the Toyota Way-styled practices implemented in the construction industry, as well as the extent to which these attributes were perceived for lean construction management. The book highlights all the actionable attributes derived from the Toyota Way model appreciated by the building professionals, but alerts the readers that some attributes felled short of implementation. Further findings from in-depth interviews and case studies are also presented in the book to provide to readers an understanding how these Toyota Way practices can be implemented in real-life projects. Collectively, all the empirical findings presented in this book can serve to enhance understanding of Toyota Way practices in the lean construction management context. The readers are then guided through to understand the gaps between actual practice and Toyota Way-styled practices, and the measures that they may undertake to circumvent the challenges for implementation. The book also presents to readers the SWOT analysis that addresses the strengths, weaknesses, opportunities and threats towards the implementation of the Toyota Way in the construction industry. The book prescribes the Toyota Way model for use in construction firms to strategically implement lean construction management. The checklist presented in the book enables readers to draw lessons that may be used additionally as a holistic assessment tool for measuring the maturity of firms with respect to their Toyota Way implementation. Consequent to this, management would then be in a better position to develop plans for Toyota Way implementation by focusing on weak areas, strengthening them, and thus increasing the likelihood of success in the implementation of the Toyota Way. In a nutshell, this book provides a comprehensive and valuable resource for firms not only in the construction industry but also businesses outside of the construction sector to better understand the Toyota Way and how this understanding can translate to implementation of lean construction/business management to enhance profitability and survivability in an increasingly competitive global market place.
Lean Construction
Author: Alexander Lange
Publisher: tredition
ISBN: 3734583837
Pages: 148
Year: 2016-12-14
View: 1279
Read: 658
Lean-Construction: practical insights for innovating construction management This book grasps some of the most practical and applicable concepts in optimizing construction projects and the objective is, to dig deeper into what is behind this so-called "lean-construction”. Six topics are selected, based on the criteria of highest relevance in conducting construction projects. Each chapter is introduced with a provocative key questions, such as "why is construction progress always lower than planned”, "why is building a steering room more than installing a performance board” or the question of "how to steer a construction site with takt-time” and many other topics such as performance management, or integrated collaborative planning. The content of this book will simplify your life as a construction manager, planner, owner or consultant. And at the same time it is easily understandable and fun to read. Alexander Lange Prof. Dr.-Ing.
An Introduction to Lean Construction
Author: Larry Rubrich
Publisher:
ISBN: 097933313X
Pages: 268
Year: 2012-05-15
View: 650
Read: 1221

Lean Construction
Author: Ted. J. Angelo
Publisher:
ISBN: 0984961003
Pages: 119
Year: 2012
View: 913
Read: 418

Love in Bloomsbury
Author: Frances Partridge
Publisher: I.B.Tauris
ISBN: 085773444X
Pages: 256
Year: 2014-03-25
View: 167
Read: 905
The Bloomsbury Group was as well known for its love affairs as for the work that was produced by its members. Of all the romantic entanglements, the love quadrangle between Frances Partridge, her husband Ralph Partridge, his first wife, Dora and Lytton Strachey was one of the most tortured (Frances loved Ralph, who loved Dora, who loved Lytton, who loved Ralph) - and tragic, ending in the death of Strachey and the suicide of Dora. Love in Bloomsbury, Frances Partridge's celebrated account of these turbulent years, describes her Victorian upbringing and tells the story of the star-crossed quartet, two of whom were doomed, the other two survivors. Replete with vivid accounts of parties and infused with the heady, Bohemian atmosphere which flourished after the First World War and revealing character sketches of all the principal "Bloomsberries" - Leonard and Virginia Woolf, her sister Vanessa Bell, John Maynard Keynes and Roger Fry. This is 'Bloomsbury laid bare' - a window onto the lives, loves and excesses of some of the 20th centuries most intriguing, yet engimatic, players.
Uncluttered Management Thinking
Author: Fredmund Malik
Publisher: Campus Verlag
ISBN: 3593393654
Pages: 184
Year: 2011-03-07
View: 516
Read: 508
Clear language is always also an instrument of clear thinking. By the same token, the clearest sign of wrong thinking - and thus, ultimately, wrong management - is language that lacks clarity. The use of carelessly defined terms can do a lot of damage; the wrong use of certain terms can lead to wrong, sometimes even risky management actions and wrong management decisions. Fredmund Malik points out the psychological, management, and economic errors managers tend to make, and explains how these errors can be avoided; for clear language is a key to right and good management. "Fredmund Malik is the leading expert in the field of management in Europe. He is the most important voice - in theory and practice of management." Peter Drucker "Malik demonstrates how, in extreme cases, the wrong use of fashionable terms can even lead to entrepreneurial disaster." Wirtschaft & Markt "Malik is listened to because management knowledge has never been more important. (...) Malik incessantly cautions against the money-mindedness at those corporations where ›stock speculators, boasters, bluffers, and sometimes even criminals‹ call the shots." Süddeutsche Zeitung
Logic, Language, Information, and Computation
Author: Juliette Kennedy, Ruy J.G.B. de Queiroz
Publisher: Springer
ISBN: 3662553864
Pages: 403
Year: 2017-08-01
View: 386
Read: 556
Edited in collaboration with FoLLI, the Association of Logic, Language and Information this book constitutes the refereed proceedings of the 24th Workshop on Logic, Language, Information and Communication, WoLLIC 2017, held in London, UK, in August 2017. The 28 contributed papers were carefully reviewed and selected from 61 submissions. The WoLLIC Workshop aims to foster interdisciplinary research in pure and applied logic. The idea is to have a forum which is large enough in the number of possible interactions between logic andthe sciences related to information and computation.
Logic, Language, and Computation
Author: Helle Hvid Hansen, Sarah E. Murray, Mehrnoosh Sadrzadeh, Henk Zeevat
Publisher: Springer
ISBN: 366254332X
Pages: 355
Year: 2017-03-29
View: 337
Read: 610
This book constitutes the refereed proceedings of the 11th International Tbilisi Symposium on Logic, Language and Computation, TbiLLC 2015, held in Tbilisi, Georgia, in September 2015.Initially there were 64 submissions, but 29 were actually presented of which 18 full papers have been accepted. The biennial conference series and the proceedings are representative of the aims of the organizing institutes: to promote the integrated study of logic, information and language. The scientific program consisted of tutorials, invited lectures, contributed talks, and two workshops.
Image Reconstruction
Author: Gengsheng Lawrence Zeng
Publisher: Walter de Gruyter GmbH & Co KG
ISBN: 3110500590
Pages: 240
Year: 2017-03-20
View: 429
Read: 1062
This book introduces the classical and modern image reconstruction technologies. It covers topics in two-dimensional (2D) parallel-beam and fan-beam imaging, three-dimensional (3D) parallel ray, parallel plane, and cone-beam imaging. Both analytical and iterative methods are presented. The applications in X-ray CT, SPECT (single photon emission computed tomography), PET (positron emission tomography), and MRI (magnetic resonance imaging) are discussed. Contemporary research results in exact region-of-interest (ROI) reconstruction with truncated projections, Katsevich’s cone-beam filtered backprojection algorithm, and reconstruction with highly under-sampled data are included. The last chapter of the book is devoted to the techniques of using a fast analytical algorithm to reconstruct an image that is equivalent to an iterative reconstruction. These techniques are the author’s most recent research results. This book is intended for students, engineers, and researchers who are interested in medical image reconstruction. Written in a non-mathematical way, this book provides an easy access to modern mathematical methods in medical imaging.
Smart Collaborative Identifier Network
Author: Hongke Zhang, Wei Su, Wei Quan
Publisher: Springer
ISBN: 3662491435
Pages: 276
Year: 2016-10-06
View: 1279
Read: 766
This book introduces a promising design for future Internet, the Smart Collaborative Identifier NETwork (SINET). By examining cutting-edge research from around the world, it is the first book to provide a comprehensive survey of SINET, including its basic theories and principles, a broad range of architectures, protocols, standards, and future research directions. For further investigation, the book also provides readers an experimental analysis of SINET to promote further, independent research. The second part of the book presents in detail key technologies in SINET such as scalable routing, efficient mapping systems, mobility management and security issues. In turn, the last part presents various implementations of SINET, assessing its merits. The authors believe SINET will greatly benefit researchers involved in designing future Internet thanks to its high degree of flexibility, security, manageability, mobility support and efficient resource utilization.
Structural Dynamic Analysis with Generalized Damping Models
Author: Sondipon Adhikari
Publisher: John Wiley & Sons
ISBN: 111886302X
Pages: 247
Year: 2014-01-17
View: 541
Read: 770
Since Lord Rayleigh introduced the idea of viscous damping in his classic work "The Theory of Sound" in 1877, it has become standard practice to use this approach in dynamics, covering a wide range of applications from aerospace to civil engineering. However, in the majority of practical cases this approach is adopted more for mathematical convenience than for modeling the physics of vibration damping. Over the past decade, extensive research has been undertaken on more general “non-viscous” damping models and vibration of non-viscously damped systems. This book, along with a related book Structural Dynamic Analysis with Generalized Damping Models: Analysis, is the first comprehensive study to cover vibration problems with general non-viscous damping. The author draws on his considerable research experience to produce a text covering: parametric senistivity of damped systems; identification of viscous damping; identification of non-viscous damping; and some tools for the quanitification of damping. The book is written from a vibration theory standpoint, with numerous worked examples which are relevant across a wide range of mechanical, aerospace and structural engineering applications. Contents 1. Parametric Sensitivity of Damped Systems. 2. Identification of Viscous Damping. 3. Identification of Non-viscous Damping. 4. Quantification of Damping. About the Authors Sondipon Adhikari is Chair Professor of Aerospace Engineering at Swansea University, Wales. His wide-ranging and multi-disciplinary research interests include uncertainty quantification in computational mechanics, bio- and nanomechanics, dynamics of complex systems, inverse problems for linear and nonlinear dynamics, and renewable energy. He is a technical reviewer of 97 international journals, 18 conferences and 13 funding bodies.He has written over 180 refereed journal papers, 120 refereed conference papers and has authored or co-authored 15 book chapters.
Creating a Place For Ourselves
Author: Brett Beemyn
Publisher: Routledge
ISBN: 1135222401
Pages: 320
Year: 2013-05-13
View: 400
Read: 481
Creating a Place For Ourselves is a groundbreaking collection of essays that examines gay life in the United States before Stonewall and the gay liberation movement. Along with examining areas with large gay communities such as New York, San Francisco and Fire Island, the contributors also consider the thriving gay populations in cities like Detroit, Buffalo, Washington, D.C., Birmingham and Flint, demonstrating that gay communities are truly everywhere. Contributors: Brett Beemyn, Nan Alamilla Boyd, George Chauncey, Madeline Davis, Allen Drexel, John Howard, David Johnson, Liz Kennedy, Joan Nestle, Esther Newton, Tim Retzloff, Marc Stein, Roey Thorpe.
British Muslim Politics
Author: P. Akhtar
Publisher: Springer
ISBN: 1137275162
Pages: 208
Year: 2013-10-09
View: 570
Read: 937
Although there has emerged a huge interest in the Muslim communities in Britain since 9/11 and 7/7, few academic studies have focused on the political processes within Muslim communities and the impacts these have on civic engagement. This book examines the political biographies and religious identities of British Muslims of Pakistani descent.
Inside the Bank of England
Author: J. Christopher R. Dow, Christopher Dow
Publisher: Palgrave Macmillan
ISBN: 1137032308
Pages: 302
Year: 2013-01-04
View: 239
Read: 666
Christopher Dow was one of the most accomplished British economists of the post-war generation. His influence - and relative anonymity - came from devoting his exceptional abilities to public service for most of his career, notably in the Bank of England. The memoirs that he wrote during his time at the Bank shed an extraordinarily revealing light on what is widely recognised to have been one of the most difficult times for the UK economy since the 1930s, and many of these policy debates are re-emerging today in the wake of the 2007 recession. These memoirs are not only informative and topical for current economic policy, but also explore the nature of life at the top of the Bank during those troubled times, painting detailed portraits of key protagonists at the head of government.

Recently Visited